Product Code: SR1020A17_Report
The global data center construction market reached a value of US$ 203.4 Billion in 2020. Data center construction refers to the collective process of physically constructing a data center facility. The primary focus is on designing and building a data center with the required capacity, disaster tolerance systems and efficient design to perform all the necessary functions. The infrastructure usually consists of backup power supplies, data communication connections, security devices and air conditioning and fire suppression systems. This ensures that all the resources are optimally utilized, and all the environmental factors are taken into consideration.
Significant growth in the IT industry is one of the key factors creating a positive outlook for the market. The rising penetration of connected devices and convenient access to the Internet have increased the demand for data storage systems across the globe. Furthermore, widespread utilization of big data analytics, cloud-based systems and the Internet of Things (IoT) for computing videos, audio and other formats of data is also driving the market growth. Large data centers are increasingly being constructed across various sectors for enhancing computing ability, memory, networking infrastructure and storage resources. Additionally, increasing emphasis on the construction of green data centers is acting as another growth-inducing factor. Green data centers use low-emission building materials that aid in creating sustainable ecosystems and ensure efficient waste recycling. Other factors, including the increasing adoption of liquid cooling technology and direct-to-chip cooling server racks to prevent overheating in data centers, along with extensive infrastructural developments, are expected to drive the market further. Looking forward, IMARC Group expects the global data center construction market to exhibit moderate growth during the next five years.
Breakup by Construction Type:
- Electrical Construction
- UPS
- Rack PDU (Power Distribution Unit)
- Generators
- Transfer Switches and Switchgears
- Others
- Mechanical Construction
- Cooling Systems
- Racks
- Others
Breakup by Data Center Type:
- Mid-Size Data Centers
- Enterprise Data Centers
- Large Data Centers
Breakup by Tier Standards:
- Tier I & II
- Tier III
- Tier IV
Breakup by Vertical:
- Public Sector
- Oil & Energy
- Media & Entertainment
- IT & Telecommunication
- Banking, Financial Services and Insurance (BFSI)
- Healthcare
- Retail
- Others
Breakup by Region:
- North America
- United States
- Canada
- Asia Pacific
- China
- Japan
- India
- South Korea
- Australia
- Indonesia
- Others
- Europe
- Germany
- France
- United Kingdom
- Italy
- Spain
- Russia
- Others
- Latin America
- Brazil
- Mexico
- Others
- Middle East and Africa
- Turkey
- Saudi Arabia
- Others
Competitive Landscape:
- The competitive landscape of the industry has also been examined with some of the key players being AECOM, DPR construction Inc., Eaton Corporation Inc., Fujitsu Limited, Holder Construction Company, Legrand SA, Rittal GmbH & Co. KG, Schneider Electric SE, Tripp Lite, Turner Construction and Vertiv Group Corporation.
Key Questions Answered in This Report:
- How has the global data center construction market performed so far and how will it perform in the coming years?
- What has been the impact of COVID-19 on the global data center construction market?
- What are the key regional markets?
- What is the breakup of the market based on the construction type?
- What is the breakup of the market based on the data center type?
- What is the breakup of the market based on the tier standards?
- What is the breakup of the market based on the vertical?
- What are the various stages in the value chain of the industry?
- What are the key driving factors and challenges in the industry?
- What is the structure of the global data center construction market and who are the key players?
- What is the degree of competition in the industry?
Table of Contents
1 Preface
2 Scope and Methodology
- 2.1 Objectives of the Study
- 2.2 Stakeholders
- 2.3 Data Sources
- 2.3.1 Primary Sources
- 2.3.2 Secondary Sources
- 2.4 Market Estimation
- 2.4.1 Bottom-Up Approach
- 2.4.2 Top-Down Approach
- 2.5 Forecasting Methodology
3 Executive Summary
4 Introduction
- 4.1 Overview
- 4.2 Key Industry Trends
5 Global Data Center Construction Market
- 5.1 Market Overview
- 5.2 Market Performance
- 5.3 Impact of COVID-19
- 5.4 Market Forecast
6 Market Breakup by Construction Type
- 6.1 Electrical Construction
- 6.1.1 Market Trends
- 6.1.2 Market Breakup by Component Type
- 6.1.3 Market Forecast
- 6.2 Mechanical Construction
- 6.2.1 Market Trends
- 6.2.2 Market Breakup by Component Type
- 6.2.3 Market Forecast
7 Market Breakup by Data Center Type
- 7.1 Mid-size Data Centers
- 7.1.1 Market Trends
- 7.1.2 Market Forecast
- 7.2 Enterprise Data Centers
- 7.2.1 Market Trends
- 7.2.2 Market Forecast
- 7.3 Large Data Centers
- 7.3.1 Market Trends
- 7.3.2 Market Forecast
8 Market Breakup by Tier Standards
- 8.1 Tier I & II
- 8.1.1 Market Trends
- 8.1.2 Market Forecast
- 8.2 Tier III
- 8.2.1 Market Trends
- 8.2.2 Market Forecast
- 8.3 Tier IV
- 8.3.1 Market Trends
- 8.3.2 Market Forecast
9 Market Breakup by Vertical
- 9.1 Public Sector
- 9.1.1 Market Trends
- 9.1.2 Market Forecast
- 9.2 Oil & Energy
- 9.2.1 Market Trends
- 9.2.2 Market Forecast
- 9.3 Media & Entertainment
- 9.3.1 Market Trends
- 9.3.2 Market Forecast
- 9.4 IT & Telecommunication
- 9.4.1 Market Trends
- 9.4.2 Market Forecast
- 9.5 Banking, Financial Services and Insurance (BFSI)
- 9.5.1 Market Trends
- 9.5.2 Market Forecast
- 9.6 Healthcare
- 9.6.1 Market Trends
- 9.6.2 Market Forecast
- 9.7 Retail
- 9.7.1 Market Trends
- 9.7.2 Market Forecast
- 9.8 Others
- 9.8.1 Market Trends
- 9.8.2 Market Forecast
10 Market Breakup by Region
- 10.1 North America
- 10.1.1 United States
- 10.1.1.1 Market Trends
- 10.1.1.2 Market Forecast
- 10.1.2 Canada
- 10.1.2.1 Market Trends
- 10.1.2.2 Market Forecast
- 10.2 Asia Pacific
- 10.2.1 China
- 10.2.1.1 Market Trends
- 10.2.1.2 Market Forecast
- 10.2.2 Japan
- 10.2.2.1 Market Trends
- 10.2.2.2 Market Forecast
- 10.2.3 India
- 10.2.3.1 Market Trends
- 10.2.3.2 Market Forecast
- 10.2.4 South Korea
- 10.2.4.1 Market Trends
- 10.2.4.2 Market Forecast
- 10.2.5 Australia
- 10.2.5.1 Market Trends
- 10.2.5.2 Market Forecast
- 10.2.6 Indonesia
- 10.2.6.1 Market Trends
- 10.2.6.2 Market Forecast
- 10.2.7 Others
- 10.2.7.1 Market Trends
- 10.2.7.2 Market Forecast
- 10.3 Europe
- 10.3.1 Germany
- 10.3.1.1 Market Trends
- 10.3.1.2 Market Forecast
- 10.3.2 France
- 10.3.2.1 Market Trends
- 10.3.2.2 Market Forecast
- 10.3.3 United Kingdom
- 10.3.3.1 Market Trends
- 10.3.3.2 Market Forecast
- 10.3.4 Italy
- 10.3.4.1 Market Trends
- 10.3.4.2 Market Forecast
- 10.3.5 Spain
- 10.3.5.1 Market Trends
- 10.3.5.2 Market Forecast
- 10.3.6 Russia
- 10.3.6.1 Market Trends
- 10.3.6.2 Market Forecast
- 10.3.7 Others
- 10.3.7.1 Market Trends
- 10.3.7.2 Market Forecast
- 10.4 Latin America
- 10.4.1 Brazil
- 10.4.1.1 Market Trends
- 10.4.1.2 Market Forecast
- 10.4.2 Mexico
- 10.4.2.1 Market Trends
- 10.4.2.2 Market Forecast
- 10.4.3 Others
- 10.4.3.1 Market Trends
- 10.4.3.2 Market Forecast
- 10.5 Middle East and Africa
- 10.5.1 Turkey
- 10.5.1.1 Market Trends
- 10.5.1.2 Market Forecast
- 10.5.2 Saudi Arabia
- 10.5.2.1 Market Trends
- 10.5.2.2 Market Forecast
- 10.5.3 Others
- 10.5.3.1 Market Trends
- 10.5.3.2 Market Forecast
11 SWOT Analysis
- 11.1 Overview
- 11.2 Strengths
- 11.3 Weaknesses
- 11.4 Opportunities
- 11.5 Threats
12 Value Chain Analysis
13 Porters Five Forces Analysis
- 13.1 Overview
- 13.2 Bargaining Power of Buyers
- 13.3 Bargaining Power of Suppliers
- 13.4 Degree of Competition
- 13.5 Threat of New Entrants
- 13.6 Threat of Substitutes
14 Price Analysis
15 Competitive Landscape
- 15.1 Market Structure
- 15.2 Key Players
- 15.3 Profiles of Key Players
- 15.3.1 AECOM
- 15.3.1.1 Company Overview
- 15.3.1.2 Product Portfolio
- 15.3.1.3 Financials
- 15.3.1.4 SWOT Analysis
- 15.3.2 DPR construction Inc.
- 15.3.2.1 Company Overview
- 15.3.2.2 Product Portfolio
- 15.3.2.3 SWOT Analysis
- 15.3.3 Eaton Corporation Inc.
- 15.3.3.1 Company Overview
- 15.3.3.2 Product Portfolio
- 15.3.4 Fujitsu Limited
- 15.3.4.1 Company Overview
- 15.3.4.2 Product Portfolio
- 15.3.5 Holder Construction Company
- 15.3.5.1 Company Overview
- 15.3.5.2 Product Portfolio
- 15.3.6 Legrand SA
- 15.3.6.1 Company Overview
- 15.3.6.2 Product Portfolio
- 15.3.7 Rittal GmbH & Co. KG
- 15.3.7.1 Company Overview
- 15.3.7.2 Product Portfolio
- 15.3.8 Schneider Electric SE
- 15.3.8.1 Company Overview
- 15.3.8.2 Product Portfolio
- 15.3.8.3 Financials
- 15.3.9 Tripp Lite
- 15.3.9.1 Company Overview
- 15.3.9.2 Product Portfolio
- 15.3.10 Turner Construction
- 15.3.10.1 Company Overview
- 15.3.10.2 Product Portfolio
- 15.3.11 Vertiv Group Corporation
- 15.3.11.1 Company Overview
- 15.3.11.2 Product Portfolio